A project consists of nine major activities,as shown.There are three separate paths in the network: a-c-f,b-d-g,and e-h-i.
(i)What is expected project duration time?
(ii)Determine the probability that the project will take more than 35 weeks to complete.(All durations are in weeks.)
11eab92b_c477_d00e_99e6_ad14123209e7
Activity Level
A characteristic of individuals, often observed from early childhood, describing the degree of physical energy and movement, varying from very active to less active.
Folic Acid
A B vitamin that is crucial in the production of red blood cells and for the development of a healthy brain and spinal cord, particularly important during early pregnancy.
Neural Tube
An embryonic structure that later develops into the brain and spinal cord.
Fetus's Bones
The developing skeletal structure within the fetus, which begins as cartilage and undergoes ossification to become bone by birth.
Q15: A bank of ten machines requires regular
Q26: Which of the following is not an
Q47: In an infinite source model,the server utilization
Q61: A kanban card is used to signal
Q66: In relation to lean,it can be difficult
Q71: Why is there waiting in a queue
Q81: The fixed order interval model requires a
Q85: Deterministic networks use three duration estimates for
Q111: An area in a production facility consisting
Q145: Variability in demand and/or lead time can