Examlex

Solved

A Production Line Is to Be Designed for a Job

question 105

Multiple Choice

A production line is to be designed for a job with three tasks.The task times are 0.6 minutes,1.8 minutes,and 1.2 minutes.If the necessary cycle time is 1.2 minutes per unit,what is the theoretical minimum number of workstations?