In a Preliminary Work Sample of an Operation,out of 50

question 32

Essay

In a preliminary work sample of an operation,out of 50 observations the operator was observed idle in 5 observations.What sample size is required for a work sampling study if the desired confidence level is 99% and the desired accuracy level is ± 5%?