Examlex

Solved

Table 11-2 The Following Represents a Project with Four Activities.All Times Are

question 28

Multiple Choice

Table 11-2
The following represents a project with four activities.All times are in weeks.
Table 11-2 The following represents a project with four activities.All times are in weeks.    -According to Table 11-2, there are four activities in the project.Assume the normal distribution is appropriate to use to determine the probability of finishing by a particular time.What is the probability that the project is finished in 16 weeks or fewer? (Round to two decimals.)  A) 0.07 B) 0.93 C) 0.43 D) 0.77
-According to Table 11-2, there are four activities in the project.Assume the normal distribution is appropriate to use to determine the probability of finishing by a particular time.What is the probability that the project is finished in 16 weeks or fewer? (Round to two decimals.)


Definitions:

Discriminant Validity

The extent to which a construct is truly distinct from other constructs by correlating minimally with measures of different constructs.

Construct

A construct is an abstract idea or concept that is specifically chosen or created for scientific inquiry or measurement.

Face Validity

The degree to which a test or measure appears to assess what it claims to measure, based on a superficial examination, rather than through rigorous validation methods.

Anxiety Construct

A psychological framework or model representing the various aspects and manifestations of anxiety as a mental health condition.

Related Questions