Examlex
Table 10-2
Maximize Z = 34 X1 + 43 X2 + 29 X3
Subject to: 5 X1 + 4 X2 + 7 X3 ≤ 50
1 X1 + 2 X2 + 2 X3 ≤ 16
3 X1 + 4 X2 + 1 X3 ≤ 9
all Xi are integer and non-negative
Final Integer Solution: Z = 208
Decision
Variable Solution
X1 1
X2 0
X3 6
-According to Table 10-2,which presents a solution for an integer programming problem,at the optimal solution,how much slack exists in the third constraint?
Variable And Fixed Cost
Expenses that include both variable costs, which fluctuate with production or service levels, and fixed costs, which remain constant regardless of activity.
Mixed Cost
A cost consisting of a fixed component and a variable component, changing in total with the level of activity but remaining constant per unit.
Units-Of-Production Depreciation
A method of depreciation that allocates an asset's cost based on its usage, productivity, or units of production, rather than the passage of time.
Activity Bases
Criteria or units of measure used to allocate costs in activity-based costing, reflecting the extent to which cost drivers are used or consumed.
Q5: PERT often assumes that time estimates follow
Q11: Consider the following linear programming problem: <img
Q17: In production scheduling LP problems, inventory at
Q21: Resource restrictions are called constraints.
Q21: The constraints in a transportation problem deal
Q25: Explain what is meant by operational gaming
Q44: Explain how inventory can act as a
Q48: Furniture Manufacturers Inc., uses 20,000 loads of
Q58: The only restriction we place on the
Q82: In PERT, we assume that the project