Table 8-2
A small furniture manufacturer produces tables and chairs. Each product must go through three stages of the manufacturing process: assembly, finishing, and inspection. Each table requires 4 hours of assembly, 3 hours of finishing, and 1 hour of inspection. Each chair requires 3 hours of assembly, 2 hours of finishing, and 2 hours of inspection. The selling price per table is $140 while the selling price per chair is $90. Currently, each week there are 220 hours of assembly time available, 160 hours of finishing time, and 45 hours of inspection time. Assume that one hour of assembly time costs $5.00; one hour of finishing time costs $6.00; one hour of inspection time costs $4.50; and that whatever labor hours are not required for the table and chairs can be applied to another product. Linear programming is to be used to develop a production schedule. Define the variables as follows:
-According to Table 8-2, which describes a production problem, suppose it was decided that all the labor hour costs have to be covered through the sale of the tables and chairs, regardless of whether or not all the labor hours are actually used. How would the objective function be written?
Budget Constraint
The limit on the consumption bundles that a consumer can afford to purchase with a limited amount of income.
Submarine Sandwiches
A type of sandwich consisting of a long roll of bread filled with meats, cheese, vegetables, and condiments, also known as a sub, hoagie, hero, or grinder.
Pizzas
A popular dish of Italian origin consisting of a flat round base of dough baked with a topping of tomato sauce and cheese, typically with added meat, fish, or vegetables.
Black Beans
A type of legume that is widely consumed around the world, known for its nutritional value and versatility in various cuisines.
Q10: A "balanced problem" exists in a transportation
Q32: A computer start-up named Pear is considering
Q33: The minimal-spanning technique would best be used<br>A)
Q38: Since the production mix linear program applications
Q43: Consider a product mix problem, where the
Q46: The variance of the project completion time
Q61: The critical path of a network is
Q64: The simultaneous equation method is<br>A) an alternative
Q70: Which of the following statements about scatter
Q117: A large international sales organization has collected