A fast food restaurant uses full-time and part-time help to meet fluctuating demand during the day. The following table presents projected need for workers at different times of the day: There is a maximum of four full-time workers and the other workers are part-time workers. Each full-time worker is there from 9:00 until 5:00, while the part-time workers will work for 4 consecutive hours at a cost of $4.00 per hour. The cost of the full-time worker is $50 per day. The company wishes to minimize total cost while meeting the demands. Formulate this as a linear programming problem. Carefully define all decision variables.
Deep Water
Refers to parts of the ocean that are far from land and very deep, often considered to be depths exceeding 200 meters.
Strike-Slip Fault
A type of fault where two blocks of the Earth's crust slide past one another in a horizontal direction, with little to no vertical movement.
Horizontal Offset
The displacement of the Earth's surface along a fault line, measured in a horizontal direction.
Fault Scarp
A steep slope or cliff formed as a result of movement along a geological fault, typically found at the Earth's surface.
Q13: The correlation coefficient resulting from a particular
Q18: In PERT/CPM, what is meant by the
Q18: A large school district is reevaluating its
Q28: Linear programming is usually used by managers
Q36: If every point lies on the regression
Q47: The cell improvement indices for Table 9-3
Q48: The following is a payoff table giving
Q53: The concept of a local optimum is
Q75: An LP formulation typically requires finding the
Q93: Given the following small project, the critical