Use the Case Below to Answer the Following Question(s)

question 81

Multiple Choice

Use the case below to answer the following question(s) .
S&N Manufacturing makes four different steel sheets,A,B,C,and D,with different percentages of iron.Each sheet must flow through five departments,forming,rolling,sintering,painting,and quality check.The table below shows the relevant data.Production rates are shown in units/hour.(Sheet A uses imported steel and does not require rolling.) Use the case below to answer the following question(s) . S&N Manufacturing makes four different steel sheets,A,B,C,and D,with different percentages of iron.Each sheet must flow through five departments,forming,rolling,sintering,painting,and quality check.The table below shows the relevant data.Production rates are shown in units/hour.(Sheet A uses imported steel and does not require rolling.)      S&N wants to determine the number of steel sheets to produce in order to maximize monthly profit. Let A,B,C,and D denote the number of units of model A,B,C,and D to be produced,respectively. -Which of the following is the inequality/equality that describes the time constraint of the painting department? A) A/30 + B/30 + C/35 + D/25 ≤ 330 B) B/30 + C/20 + D/20 = 330 C) A/70 + B/50 + C/50 + D/44 = 330 D) A/60 + B/60 + C/70 + D/50 ≤ 330 Use the case below to answer the following question(s) . S&N Manufacturing makes four different steel sheets,A,B,C,and D,with different percentages of iron.Each sheet must flow through five departments,forming,rolling,sintering,painting,and quality check.The table below shows the relevant data.Production rates are shown in units/hour.(Sheet A uses imported steel and does not require rolling.)      S&N wants to determine the number of steel sheets to produce in order to maximize monthly profit. Let A,B,C,and D denote the number of units of model A,B,C,and D to be produced,respectively. -Which of the following is the inequality/equality that describes the time constraint of the painting department? A) A/30 + B/30 + C/35 + D/25 ≤ 330 B) B/30 + C/20 + D/20 = 330 C) A/70 + B/50 + C/50 + D/44 = 330 D) A/60 + B/60 + C/70 + D/50 ≤ 330 S&N wants to determine the number of steel sheets to produce in order to maximize monthly profit.
Let A,B,C,and D denote the number of units of model A,B,C,and D to be produced,respectively.
-Which of the following is the inequality/equality that describes the time constraint of the painting department?


Definitions:

Light-Dependent Reactions

First stage of photosynthesis; convert light energy to chemical energy. A noncyclic pathway produces ATP, oxygen, and NADPH; a cyclic pathway produces ATP only.

Cyclic

A term describing structures or processes that occur in or follow a circular or repeating pattern.

Noncyclic

Referring to processes that do not repeat in a cycle but occur in a single, linear sequence or are constant.

Cyclic Pathway

A series of biochemical reactions where the last component regenerates the first, facilitating a continuous process.

Related Questions