Examlex
Assume that four jobs,A-D,require the CPU cycles listed below.Using the SJN algorithm,the average turnaround time is ____. Job: A B C D
CPU cycle: 5 2 6 4
Q7: Operating systems with networking capability have a
Q13: Windows XP was the last Windows operating
Q22: _ peripheral devices are assigned to only
Q27: In demand paging,pages are _ between main
Q30: There is no return from a successful
Q45: BUN is the abbreviation for _.(three words)
Q85: The sign of abnormally low levels of
Q87: Proctoptosis is the prolapse of the rectum.
Q87: A combining form is made of a(n)_
Q96: A vagotomy is defined as:<br>A)surgical dissection of