On a typical Monday, an average of 8 customers per hour arrive at the bank to transact business. There is one teller at the bank, and the average time required to transact business is five minutes. It is assumed that service times may be described by the exponential distribution. A single line would be used, and the customer at the front of the line would go to the first available bank teller. If a single teller is used, find:
a) The average time in the line.
b) The average number in the line.
c) The average time in the system.
d) The average number in the system.
e) The probability that the bank is empty.
f) If the business is considering adding a second teller (who would
work at the same rate as the first) to reduce the waiting time
for customers. She assumes that this will cut the waiting time in
half. If a second teller is added, find the new answers to parts (a)
to (e).
Construction Site
A location where construction work such as building, engineering, or demolition projects is carried out.
Cast Spoke
A type of wheel construction characterized by spoke patterns cast into the wheel, providing strength and aesthetic appeal to the design.
Cast Spoke Wheel
A type of wheel manufactured by pouring molten metal into a mold that has spokes as part of its design, providing strength and aesthetic appeal.
Stud-Piloted Disc
A type of wheel mounting system where studs align and secure the disc wheel in place, often found in heavy-duty vehicles.
Q8: The optimal solution of a linear programming
Q39: In a minimization problem, a negative improvement
Q47: A manufacturing work cell has a takt
Q53: A grocery store is trying to find
Q57: Students arrive randomly at the help desk
Q57: In a decision tree, a square symbol
Q71: A feedlot is trying to decide
Q79: An assembly line has been designed
Q91: Your firm has expertise with a special
Q135: The work cell layout, a special arrangement