Examlex

Solved

What Is the Context Switch Time, Associated with Swapping, If

question 41

Short Answer

What is the context switch time, associated with swapping, if a disk drive with a transfer rate of 2 MB/s is used to swap out part of a process that is 200 KB in size? Assume that no seeks are necessary and that the average latency is 15 ms. The time should reflect only the amount of time necessary to swap out the process.


Definitions:

Material Requirements Plan

A system used in manufacturing to calculate the materials and components needed to manufacture a product, ensuring materials are available for production and products are available for delivery.

Subassemblies

Components that are assembled separately but are used as parts of a final assembly or finished product.

Projected Output Rate

An estimated rate of production for future periods based on current data and trends, forecasting the volume of output.

Record Accuracy

The degree to which records are complete, correct, and reliable.

Related Questions