Straker Industries Estimated Its Short-Run Costs Using a U-Shaped Average AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 }

question 51

Multiple Choice

Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC) at Straker Industries is $1,000.  Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC) at Straker Industries is $1,000.   At what level of output is average variable cost (AVC) at its minimum point for Straker Industries? A) 0.14 B) 4.7 C) 7 D) 14 E) 28 At what level of output is average variable cost (AVC) at its minimum point for Straker Industries?


Definitions:

Departmental Predetermined Overhead Rates

Rates calculated in advance for each department, used to assign overhead costs based on estimated activity levels.

Machine-Hours

A measure of the total time that machines are operating, often used as a basis for allocating manufacturing overhead costs.

Markup

The amount added to the cost price of goods to cover overhead and profit, resulting in the selling price.

Selling Price

The amount of money charged to the customer for a product or service, determined by adding a margin to the cost price.