TABLE 9-1
Microsoft Excel was used on a set of data involving the number of defective items found in a random sample of 46 cases of light bulbs produced during a morning shift at a plant. A manager wants to know if the mean number of defective bulbs per case is over 20 during the morning shift. She will make her decision using a test with a level of significance of 0.10. The following information was extracted from the Microsoft Excel output for the sample of 46 cases:
n = 46; Arithmetic Mean = 28.00; Standard Deviation = 25.92; Standard Error = 3.82;
Null Hypothesis: H0 : μ ≤ 20.000; α = 0.10; df = 45; T Test Statistic = 2.09;
One-Tail Test Upper Critical Value = 1.3006; p-value = 0.021; Decision = Reject.
-Referring to Table 9-1, the manager can conclude that there is sufficient evidence to show that the mean number of defective bulbs per case is over 20 during the morning shift using a level of significance of 0.10.
Predetermined Time Standard
A method used in industrial engineering and time management to estimate the time required for completing a task based on standard time units.
TMU
Time Measurement Unit, a standard unit used in time study and work measurement for setting standard times for tasks.
Time Measurement Unit
A standard unit of time used in work measurement and time studies to assess the time required for tasks.
Therblig
A basic motion element used in motion study to analyze the physical movements needed to perform a manual operation or task.
Q1: Referring to Table 10-11, what is the
Q18: The only way one can eliminate sampling
Q38: Referring to Table 11-3, the numerator and
Q40: A random sample of 50 provides a
Q55: Referring to Table 12-9, what is the
Q86: How many tissues should the Kimberly Clark
Q97: Referring to Table 11-7, the null hypothesis
Q106: The t distribution is used to construct
Q137: Referring to Table 12-13, the assumptions needed
Q163: At a computer manufacturing company, the actual