Table 42
High Tech, Inc The Sawing Machines Operate on Two 8-Hour Shifts, 5 Days

question 91

Multiple Choice

Table 4.2
High Tech, Inc. is producing two types of products: A and B. Both are produced at the same sawing operation. Because of demand uncertainties, the operations manager obtained three demand forecasts (pessimistic, expected, and optimistic) . The demand forecasts, batch sizes (units/batch) , processing times (hr/unit) , and setup times (hr/batch) follow.

 Time Standard  Demand Forecasts ( 000 units/yr)   Product  Processing  Setup  Batch Size  Pessimistic  Expected  Optimistic  A .202.040200240300 B .153.050160180200\begin{array}{c}\quad\quad\quad\quad\quad\text { Time Standard } \quad\quad \quad\quad\quad\quad\quad \text { Demand Forecasts ( 000 units/yr) }\\\begin{array}{|l|l|l|l|l|l|l|}\hline \text { Product } & \text { Processing } & \text { Setup } & \text { Batch Size } & \text { Pessimistic } & \text { Expected } & \text { Optimistic } \\\hline \text { A } & .20 & 2.0 & 40 & 200 & 240 & 300 \\\text { B } & .15 & 3.0 & 50 & 160 & 180 & 200 \\\hline\end{array}\end{array}
The sawing machines operate on two 8-hour shifts, 5 days per week, and 50 weeks per year. The manager wants to maintain a 10 percent capacity cushion.
-Using the information from Table 4.2,what is the maximum number of machines needed (assuming no reliance on short-term option) ?


Definitions:

Proofreading

The process of reading and correcting written text to ensure accuracy in grammar, spelling, punctuation, and formatting.

Revising

The process of reviewing and altering a piece of writing to improve its content, structure, and clarity, often involving substantial changes.

Prewriting

The initial stage of the writing process, involving brainstorming, outlining, and planning content before drafting.

First Draft

The initial version of a piece of writing or document, before any edits or revisions, capturing the primary ideas and structure.

Related Questions