Larry's Wickets,Inc.is producing two types of products: A and B.Both are produced at the same machining operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic).The demand forecasts,batch sizes (units/batch),processing times (hr/unit),and setup times (hr/batch)follow.
Time Standard Demand Forecasts (000 units/yr)
The machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 20 percent capacity cushion.
a.What is the minimum number of hours required of the machining equipment for the next year?
b.How many hours of capacity can the company expect from each machine?
c.What is the minimum number of machines needed (assuming no reliance on short-term options)?
d.What is the maximum number of machines needed (assuming no reliance on short-term options)?
Term And Connector
A search strategy used in legal databases to combine keywords with connectors like AND, OR, and NOT to refine search results.
Liable
The state of being legally responsible for something, especially in the context of damages or losses.
Tobacco Manufacturers
Companies engaged in the production and distribution of tobacco products, including cigarettes, cigars, pipe tobacco, and snuff.
Natural Language Method
Techniques used in artificial intelligence and computational linguistics to enable machines to understand and interpret human (natural) language.
Q10: The average lead time of a unit
Q28: The advantage of variable measurements is that
Q42: A(n)_ is an item made to order
Q48: The _ distribution specifies the probability that
Q99: For an item under continuous review,the on-hand
Q101: _ argued that 85% of quality problems
Q121: One of the principles that total quality
Q132: Increasing the overall process capacity can only
Q137: Equipment breakdowns are an example of an
Q158: The two-bin inventory system is a type