Examlex
Two technicians are discussing EPC solenoids. Technician A says the EPC solenoid is a PWW (pulse width modulated) solenoid and receives a duty cycle signal from the TCM. Technician B says the EPC solenoid is an on/off solenoid that is turned on when the TCM sees the 3-4 upshift. Who is correct?
Industry Standards
are agreed-upon norms and specifications within an industry that ensure products, services, and practices meet certain quality and safety criteria.
Quantitative Research
A research method focusing on obtaining data through objective measurements and statistical, mathematical, or numerical analysis of data collected through polls, questionnaires, and surveys.
Numerical Data
Quantitative information consisting of numbers, which can be used in statistical analysis to produce findings or prove hypotheses.
Descriptive Responses
Answers or feedback that provide detailed information or elaboration on a subject.
Q10: _ contain the transmission and the final
Q13: What type of rear suspension is subject
Q16: Technician A says if the sun and
Q16: All-wheel drive vehicles may use a viscous
Q26: While discussing transmission/transaxle rebuilding procedures, Technician A
Q32: When testing a solenoid with an ohmmeter,
Q58: Which of the following could cause a
Q59: Describe shift blocking.
Q71: On a five-speed manual transmission, reverse gear
Q78: The two types of pressure plate assemblies