Why it is necessary to make sure a project is in the same risk class as existing operations before using the WACC as the discount rate?


Definitions:

Economies of Scale

Cost advantages that enterprises obtain due to their scale of operation, with cost per unit of output generally decreasing with increasing scale.

Average Total Cost

The total cost of production divided by the total quantity of output, representing the cost per unit of output.

Scale of Operations

The scope or size of production, or the level at which a business operates in terms of output.

Average Cost Curve

A graphical representation that shows how the cost per unit of production varies with the quantity produced.