Which of the following would be enclosed in a set of single quotation marks?


Definitions:

Predetermined Overhead Rate

An estimated overhead rate used in costing to assign indirect costs to products or services based on an activity measure, recalculated for emphasis.

Machine-Hours

A unit of measure for the total operational time of machines within a manufacturing or production process.

Job Cost Sheet

A record or document that tracks the costs associated with a specific job or project within a job-order costing system.

Predetermined Overhead Rate

The rate used to allocate manufacturing overhead costs to products, computed before the period begins based on estimated costs and activity levels.