You Have Collected the Data for a Time-Cost CPM Scheduling

question 58

Multiple Choice

You have collected the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the project "direct costs" are given below. The indirect costs for the project are determined on a daily duration basis. If the project lasts 16 days the total indirect costs are $400, 15 days they will be $250, 14 days they will be $200, and 13 days they will be $100. At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs) ?
You have collected the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the project  direct costs  are given below. The indirect costs for the project are determined on a daily duration basis. If the project lasts 16 days the total indirect costs are $400, 15 days they will be $250, 14 days they will be $200, and 13 days they will be $100. At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs) ?   A)  16 days B)  15 days C)  14 days D)  13 days E)  12 days


Definitions:

Stimulus Strength

The intensity level of a stimulus which affects the magnitude and nature of the response in a biological system.

Action Potentials

Rapid, temporary changes in the electrical membrane potential of cells, which are fundamental in the conduction of impulses along nerves and muscle fibers.

Frequency

In physics, it refers to the number of occurrences of a repeating event per unit of time, often used in the context of waves.

Repolarization

The process by which a neuron or muscle cell returns to its resting negative charge after depolarization.

Related Questions