You Have Collected the Data for a Time-Cost CPM Scheduling

question 58

Multiple Choice

You have collected the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the project "direct costs" are given below. The indirect costs for the project are determined on a daily duration basis. If the project lasts 16 days the total indirect costs are $400, 15 days they will be $250, 14 days they will be $200, and 13 days they will be $100. At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs) ?
You have collected the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the project  direct costs  are given below. The indirect costs for the project are determined on a daily duration basis. If the project lasts 16 days the total indirect costs are $400, 15 days they will be $250, 14 days they will be $200, and 13 days they will be $100. At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs) ?   A)  16 days B)  15 days C)  14 days D)  13 days E)  12 days


Definitions:

Porosity

A measure of how much of a rock, soil, or sediment's volume is occupied by voids or pores, affecting its ability to hold fluids.

Confined Aquifer

An aquifer that is separated from Earth’s surface by materials with low permeability.

Artesian Well

A well drilled through impermeable strata to reach water capable of rising to the surface under natural pressure.

Confined Aquifer

An aquifer bounded by impermeable layers, where the water is under pressure, allowing it to rise above the level of the aquifer when tapped.

Related Questions