Use This Earned Schedule Table to Determine the Schedule Variance

question 84

Multiple Choice

Use this earned schedule table to determine the schedule variance (t) for this project at the end of Month 6. Use this earned schedule table to determine the schedule variance (t)  for this project at the end of Month 6.   A)  -2.74 B)  -3.74 C)  -2.26 D)  -1.26


Definitions:

Relationships

Connections or associations between two or more people, which can be personal, professional, or otherwise, and influence social interactions.

Histogram

Graph that uses vertical bars to represent the frequencies of a set of variables. The measured values found within the distribution are listed on the horizontal axis (x-axis) and frequency counts are placed on the vertical axis (y-axis).

Bar Graph

A chart that represents categorical data with rectangular bars with lengths proportional to the values they represent.

Frequency Polygon

Variation of a histogram where rather than a series of vertical bars, a line is drawn to connect the midpoint for each of the different measured variables in the distribution.