ABC Construction Agreed to Build a Pool for Miranda in Exchange

question 2

Multiple Choice

ABC Construction agreed to build a pool for Miranda in exchange for $100 000. The pool was to be built during the month of May, but payment was not due until the end of August. The pool was completed on schedule. However, because it was experiencing financial difficulties, ABC orally assigned its contractual rights against Miranda to Mirth Enterprises in early June. In July, Miranda discovered that the pool leaked. Because ABC denied responsibility, Miranda had the problem fixed by another company at a cost of $20 000. The evidence now indicates that the problem was in fact caused by ABC's breach of contract. ABC failed to use appropriate materials when it constructed the pool. Which of the following statements is TRUE?


Definitions:

Electrocauterization

The use of a needle, probe, or loop heated by electric current to remove growths such as warts, to stop bleeding, and to control nosebleeds that either will not subside or continually recur.

Grounding Pad

A safety device used during surgical procedures to prevent burn injuries by dispersing excess electrical current away from the patient.

Freezing Cycle

A process involving the lowering of temperature to below 0°C, used in various contexts such as food preservation or climate patterns.

Proliferation Phase

The second phase of wound healing, in which new tissue forms, closing off the wound.

Related Questions