question 142
Multiple Choice
Appleby Manufacturing uses an activity-based costing system. The company produces Model F and Model G. Information relating to the two products is as follows: Units produced Machine hours Direct labor hours Material handling (number of moves) Setups Purchase orders Inspections Product line variations Model F 24,0007,5008,0004,0005,0003010,0008 Model G 30,0008,50012,0006,0007,0004014,00012 The following overhead costs are reported for the following activities of the production process: Material handling Labor-related overhead Setups Product design Batch inspections Central purchasing $40,000120,00060,000100,000120,00070,000
Jones manufacturing has used activity based costing to assign costs to Models F and G as given in the table below:
Activity Material handling Labor related overhead Setups Product design Batch Inspections Central purchasing total Cost Pool $40,000$120,000$60,000$100,000$120,000$70,000 Driver 10,00020,00012,0002024,00070 Pool Rate $4$6$5$5,000$5$1,000 Model F Activity 4,0008,0005,000810,00030 Model F Cost $16,000$48,000$25,000$40,000$50,000$30,000$209,000 Model G Activity 6,00012,0007,0001214,00040 Model G Cost $24,000$72,000$35,000$60,000$70,000$40,000$301,000 Total $40,000$120,000$60,000$100,000$120,000$70,000$510,000
Appleby Manufacturing wants to implement an approximately relevant ABC system by using the two most expensive activities for cost assignment.
Under this new approach using the new rates, what are the overhead costs assigned to Model G in this approximately relevant ABC system?
Definitions:
Geographic Design
Refers to the strategic planning and arrangement of geographic locations and spaces to achieve specific objectives or outcomes.
Specialized Activities
Specialized activities refer to tasks, operations, or processes that require specific expertise or focus in a particular field or area of knowledge, often contributing to more efficient and effective outcomes.
Network Design
The planning and structuring of a network, including the selection and interconnection of network components, to meet specific business or operational requirements.
Geographic Design
The arrangement or planning of elements within a spatial environment based on geographical factors.