Examlex

Solved

The Amount of Time Necessary for Assembly Line Workers to Complete

question 87

Short Answer

The amount of time necessary for assembly line workers to complete a product is a normal variable with a mean of 15 minutes and a standard deviation of 2 minutes.The probability is
that a product is assembled in between 10 and 12 minutes.


Definitions:

Critical Factor

An essential element or condition required for a process or outcome to occur, often determining success or failure.

Gentle Slopes

Slopes with a gradual incline, typically found in landscapes where erosion has smoothed the terrain over time.

Discontinuities

Interruptions or breaks in the physical continuity or uniformity of a geological structure, such as faults or joints.

Soluble Minerals

Soluble minerals are those that can dissolve in water, playing a crucial role in the geochemistry of groundwater and the formation of features like caves and sinkholes.

Related Questions