Consider the spreadsheet for Stone Age Surfboards provided below. Use this data to answer the following question(s) , using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 8 skilled workers, each of whom works
9.25 hours per day. The finishing department has 5 workers, each of whom works a 6-hour shift per day. Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing. The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model. The company anticipates selling at least twice as many Lava models as Graystone models.
-What is the total number of hours used for fabrication?
Simplest Form
An expression or fraction that has been simplified to the point that it cannot be made any simpler, often by removing common factors.
Add Fractions
The process of combining two fractions with a common denominator to form a single fraction.
Simplest Form
Refers to the state of an algebraic expression when it has been reduced to the most basic or simplified version without changing its value.
Reciprocal
The inverse of a number or expression; for a nonzero number \(x\), its reciprocal is \(1/x\).
Q29: A graphical depiction of a frequency distribution
Q33: If the unit profit on Graystone surfboards
Q35: Which of the following is the average
Q39: What is the maximum opportunity loss incurred
Q41: The Risk Solver Platform feature allows you
Q45: What is the total number of hours
Q48: Describe the steps involved in the construction
Q60: The _ of an annuity is the
Q144: The primary accounting standard-setting body in the
Q200: Compute the missing amount in each