The Initial Cost of Constructing a Flood Control Dam Is

question 8

Essay

The initial cost of constructing a flood control dam is estimated to be $5 million, with annual upkeep costs of $340,000. Annual benefits (e.g., reduced flood damage, agricultural development, and tourism, etc.) are expected to be $1.25 million, whereas the disbenefits from significant ecological and human social changes are expected to be $0.025 million per year. Assume the dam will have a useful life of 53 years. At an interest rate of 17% per year, should the dam be constructed on the basis of its conventional B- C ratio, with AW as the equivalent- worth measure?


Definitions:

Glomerulonephritis

A type of kidney disease characterized by inflammation of the glomeruli, affecting the organ's ability to filter waste and fluids.

Chronic Renal Failure

The end result of the progressive loss of kidney function.

Hypotension

Abnormally low blood pressure.

Urine

A liquid by-product of metabolism in humans and many animals, excreted by the kidneys through the process of urination.

Related Questions