Examlex

Solved

An Engineer Is Considering the Size of a Reservoir for Flood

question 4

Essay

An engineer is considering the size of a reservoir for flood control in the northern part of Germany. The size of the reservoir is closely related to the annual rainfall. In addition, there will be reparation costs from damages when the amount of rainfall exceeds the design capacity. If such damage occurs, it is estimated that the annual reparation cost will be 2.3% of the capital investment. The probabilities of specific amounts of rainfall per year and the estimated investment costs of the reservoir are given below. Using an interest rate of 8% per year and a study period of 11 years, determine the appropriate investment on the basis of AW. An engineer is considering the size of a reservoir for flood control in the northern part of Germany. The size of the reservoir is closely related to the annual rainfall. In addition, there will be reparation costs from damages when the amount of rainfall exceeds the design capacity. If such damage occurs, it is estimated that the annual reparation cost will be 2.3% of the capital investment. The probabilities of specific amounts of rainfall per year and the estimated investment costs of the reservoir are given below. Using an interest rate of 8% per year and a study period of 11 years, determine the appropriate investment on the basis of AW.


Definitions:

Tacit Consent

The implicit agreement to abide by the laws of a country by remaining there.

Abiding

Lasting a long time; enduring or continually recurring.

Morality

Principles concerning the distinction between right and wrong or good and bad behavior.

Justice

The principle of fairness and moral rightness that guides the administration of law and the treatment of individuals within a society.

Related Questions