A small flower shop takes orders by phone and then one of the staff florists is assigned to Prepare the arrangement.The time it takes to process phone orders is normally distributed With a mean of 6 minutes and a standard deviation of 2.5 minutes.The time it takes for an Arrangement to be completed is normally distributed with a mean of 35 minutes and a Standard deviation of 8.6 minutes.What is the probability that it will take more than 50 Minutes to process a phone order and complete the floral arrangement at this flower shop?


Definitions:

Overapplied Manufacturing Overhead

A situation where the actual manufacturing overhead costs are less than the overhead assigned to products.

Underapplied Manufacturing Overhead

The condition where the estimated manufacturing overhead costs are less than the actual overhead incurred, resulting in a shortfall that needs to be adjusted.

Finished Goods

Items that are ready after production but still await sale or delivery to consumers.

Underapplied Manufacturing Overhead

Occurs when the allocated manufacturing overhead costs are less than the actual overhead costs.