Examlex

Solved

Find the Exact Value Of cscθ\csc \theta , Using the Triangle Shown in the Figure Below, If

question 75

Multiple Choice

Find the exact value of cscθ\csc \theta , using the triangle shown in the figure below, if a=24a = 24 and b=7b = 7 .
 Find the exact value of  \csc \theta , using the triangle shown in the figure below, if  a = 24  and  b = 7 .    A)   \frac { 25 } { 7 }  B)   \frac { 25 } { 24 }  C)   \frac { 24 } { 7 }  D)   \frac { 7 } { 25 }  E)   \frac { 24 } { 25 }


Definitions:

Output

The aggregate production of goods or services by an enterprise, economic sector, or the entire economy.

AVC

Another term for average variable cost, emphasizing the costs that vary with the level of output produced.

AVC

Average Variable Cost refers to the total variable cost per unit of output in economics, capturing costs that change with the level of output.

ATC

Stands for Average Total Cost, which is calculated by dividing the total cost of production by the quantity of output produced, representing the per-unit production cost.

Related Questions