Write a loop that computes (No need to write a complete program) Write a loop that computes (No need to write a complete program)    A)  45 B)  11 C)  13 D)  12 E)  10


Definitions:

Gross Requirement

The total demand for an item or component before considering inventory on hand or scheduled receipts, typically used in production and inventory planning.

Bill Of Material

A complete rundown of essential substances, components, and procedures for constructing, crafting, or restoring a product or service.

Cumulative Lead Time

The total time required to manufacture a product, including the time to procure all necessary materials and components.

Component Y

A hypothetical or specific part of a larger system or machine, typically referred to in the context of manufacturing, assembly, or engineering projects.