A Control Chart for R Is Shown Below

question 86

Essay

A control chart for R is shown below. Determine whether the process variation is within statistical control. If it
is not, identify which of the three out-of-control criteria lead to rejection of statistically stable variation. A control chart for R is shown below. Determine whether the process variation is within statistical control. If it is not, identify which of the three out-of-control criteria lead to rejection of statistically stable variation.


Definitions:

Independent Events

Two or more events are independent if the occurrence of one does not affect the probability of the other(s).

P(A)

The probability of event A occurring in a given statistical experiment.

P(B)

In probability, represents the likelihood or chance of a particular event B occurring.

Conditional Probability

The conditional probability of an event happening after it's established that another event has occurred.