Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete) , B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days, which job should be scheduled first if you use the SOT priority rule for job sequencing?


Definitions:

T Procedure

A statistical method used to infer the unknown mean of a population based on a sample mean, especially when the sample size is small.

Non-Normality

A characteristic of a dataset that deviates from the bell-shaped curve associated with a normal distribution, potentially affecting statistical tests.

Skewness

Skewness is a measure of the asymmetry of the probability distribution of a real-valued random variable about its mean, indicating how much the distribution leans towards the left or right.

P-value

A statistical measure that helps scientists determine the significance of their research results, indicating the probability of observing the results given that the null hypothesis is true.