Examlex

Solved

In Setting Up a Kanban Control System You Need to Determine

question 3

Multiple Choice

In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20% of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what is the number of Kanban card sets needed?


Definitions:

Absorption Costing

A costing method that includes all manufacturing costs - direct materials, direct labor, and both variable and fixed manufacturing overhead - in the cost of a product.

Salespeople Salaries

The total amount paid to employees who are responsible for selling a company's products or services.

Variable Costing

An accounting method that only considers variable costs for product costing, excluding fixed manufacturing overhead.

Absorption Costing

A costing method that includes all manufacturing costs — direct materials, direct labor, and both variable and fixed manufacturing overhead — in the cost of a product.

Related Questions