Below Are the Data for a Time-Cost CPM Scheduling Model

question 8

Multiple Choice

Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs. Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.   What are the total time of this project and total normal cost? A) Total time is 13 days, total cost is $1200 B) Total time is 12 days, total cost is $1700 C) Total time is 11 days, total cost is $1600 D) Total time is 10 days, total cost is $1750 E) Total time is 9 days, total cost is $1700 What are the total time of this project and total normal cost?


Definitions:

External Abdominal Oblique

A muscle located on the lateral and front sides of the abdomen, involved in rotating and bending the trunk.

Corrugator Supercilii

A small, narrow muscle close to the eyebrow, responsible for drawing the eyebrow downward and medially, creating frown lines on the forehead.

Levator Palpebrae Superioris

A muscle in the orbit of the eye that elevates the upper eyelid, allowing the eye to open.

Orbicularis Oculi

A circular muscle around the orbit of the eye that enables blinking and closing of the eyelids.

Related Questions