SimQuick is to be used to simulate the following bank process:
Customers arrive at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes. The Line Buffer holds 6 customers. If a customer arrives and the buffer line is filled, the customer leaves. The Work Station Teller's processing time per customer is normally distributed, with a mean of 3.0 minutes and a standard deviation of 0.5 minutes. The Served Customer Buffer in the flowchart is used to count the number of customers processed during the simulation period. A 2-hour period is to be simulated and the simulation should be repeated 30 times. Determine:
a) The number of customers served during the 2-hour period;
b) The percentage of customers who arrived at the bank and left because the buffer line was full;
c) The utilization of the teller (% of time working) during the 2-hour period;
Q13: Customer arrival rates vary throughout the day
Q22: Referring to Table 19-6,the optimal strategy using
Q23: Briefly explain why the economic production lot
Q46: Use the information in Table D.2. If
Q48: Using the information in Table J.8, and
Q56: A single-sampling plan has the following performance:
Q56: A work standard is the time required
Q65: Briefly describe the meaning of a shadow
Q85: _ is the worst level of quality
Q157: Referring to Table 19-1,if the probability of