You have been asked to balance a flow shop assembly operation to achieve an output rate of 120 units per eight-hour day. Task times and precedence relationships are shown in the table below.
You have been asked to balance a flow shop assembly operation to achieve an output rate of 120 units per eight-hour day. Task times and precedence relationships are shown in the table below.    (a) Draw the precedence diagram. (b) Determine the desired cycle time. (c) Determine the theoretical minimum number of stations needed. (d) Balance this line using the fewest following tasks heuristic. (e) What is the efficiency of the line obtained in part d? (a) Draw the precedence diagram.
(b) Determine the desired cycle time.
(c) Determine the theoretical minimum number of stations needed.
(d) Balance this line using the fewest following tasks heuristic.
(e) What is the efficiency of the line obtained in part d?


Definitions:

Callable Bond

A type of bond that can be redeemed by the issuer before its maturity date, typically at a premium price.

Convertible Bond

A type of bond that can be converted into a predetermined amount of the company's equity at certain times during its life, usually at the discretion of the bondholder.

Yankee Bond

A bond issued in the United States by foreign banks and corporations, denominated in U.S. dollars.

DAX

The stock market index that represents 40 of the largest and most liquid German companies trading on the Frankfurt Stock Exchange.

Related Questions