A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. Managers wish to produce 600 units per day, working two 8-hour shifts.
A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. Managers wish to produce 600 units per day, working two 8-hour shifts.    (a) Draw a network diagram of precedence relationships. (b) Compute the required cycle time per unit in seconds. (c) Compute the minimum number of workstations required to produce 600 units per day. (d) Balance this line using the longest processing time heuristic. (e) What is the efficiency of the line obtained in part (d)? (a) Draw a network diagram of precedence relationships.
(b) Compute the required cycle time per unit in seconds.
(c) Compute the minimum number of workstations required to produce 600 units per day.
(d) Balance this line using the longest processing time heuristic.
(e) What is the efficiency of the line obtained in part (d)?


Definitions:

Stabilization

The process of making a compound, mixture, or structure more stable or resistant to change, often through chemical reactions or physical processes.

Most Acidic

Describes the substance with the highest acidity in a given context, typically having the lowest pH or greatest ability to donate a proton (H+ ion).

Proton

A subatomic particle found in the nucleus of an atom, possessing a positive electrical charge.

Methanesulfonic Acid

A strong organic sulfonic acid with the molecular formula CH3SO3H, used in various chemical synthesis processes.

Related Questions