Examlex

Solved

TABLE 17-3
a Quality Control Analyst for a Light Bulb

question 101

Multiple Choice

TABLE 17-3
A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day.

 Day Xˉ (in minutes)  R158.55.1247.67.8364.36.1460.65.7563.76.2657.56.0755.05.4854.96.1955.05.91062.75.01161.97.11260.06.51358.35.91452.05.2\begin{array}{lcl} \underline { \text { Day } }& \underline { \bar { X } \text { (in minutes) }} & \underline { R }\\1 & 58.5 & 5.1 \\2 & 47.6 & 7.8 \\3 & 64.3 & 6.1 \\4 & 60.6 & 5.7 \\5 & 63.7 & 6.2 \\6 & 57.5 & 6.0 \\7 & 55.0 & 5.4 \\8 & 54.9 & 6.1 \\9 & 55.0 & 5.9 \\10 & 62.7 & 5.0 \\11 & 61.9 & 7.1 \\12 & 60.0 & 6.5 \\13 & 58.3 & 5.9 \\14 & 52.0 & 5.2\end{array}

-Referring to Table 17-3, suppose the analyst constructs an Xˉ\bar { X } chart to see if the production process is in-control. What is the lower control limit (LCL) for this chart?


Definitions:

Fallacy

An error in reasoning that renders an argument invalid or unsound.

Alternatives

Different options or choices available in a given situation or problem.

Contra-Binary Principle

A concept opposing or challenging the idea that things can only exist in two distinct, opposite categories, advocating for a more nuanced or spectrum-based understanding.

True

In accordance with fact or reality, not false or erroneous.

Related Questions