question 130

Multiple Choice

A forecast based on the previous forecast plus a percentage of the forecast error is:


Definitions:

Work Centre

A specific location where particular tasks or operations are carried out within a manufacturing process or factory.

Capacity

The maximum level of output that a facility, system, or machine can produce under specific conditions over a given period.

Load Smoothing

A strategy to balance workload or production levels to minimize peaks and troughs, ensuring consistent use of resources over time.

Bill of Material

An all-encompassing register of foundational materials, pieces, and recipes necessary for erecting, generating, or fixing a product or service.