Examlex

Solved

The Production Planner for a Private Label Soft Drink Maker

question 88

Multiple Choice

The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R) and sassafras soda (S) . Two resources are constrained: production time (T) , of which she has at most 12 hours per day; and carbonated water (W) , of which she can get at most 1,500 gallons per day. A case of root beer requires 2 minutes of time and 5 gallons of water to produce, while a case of sassafras soda requires 3 minutes of time and 5 gallons of water. Profits for the root beer are $6.00 per case, and profits for the sassafras soda are $4.00 per case. What is the production time constraint (in minutes) ?


Definitions:

Concrete Class

A class in Java or other object-oriented programming languages that has an implementation and can be instantiated.

HashSet< T >

HashSet<T> in Java is a collection that stores unique elements only, providing efficient operations like add, remove, and check for the presence of elements.

Primitive Type

In programming, a primitive type is a basic data type provided by a programming language as a basic building block.

Vector

An array-like data structure that can grow and shrink in size dynamically, from the Java Collection framework.

Related Questions