The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R) and sassafras soda (S) . Two resources are constrained: production time (T) , of which she has at most 12 hours per day; and carbonated water (W) , of which she can get at most 1,500 gallons per day. A case of root beer requires 2 minutes of time and 5 gallons of water to produce, while a case of sassafras soda requires 3 minutes of time and 5 gallons of water. Profits for the root beer are $6.00 per case, and profits for the sassafras soda are $4.00 per case. What is the production time constraint (in minutes) ?
Analysis And Planning
The systematic process of examining an organization's current state to develop strategic plans for future actions.
Transfers
The process of moving employees from one position, location, or job to another within the same organization.
Promotions
The advancement of an employee to a higher-ranked position with greater responsibility, usually accompanied by an increase in salary.
Q14: Returned goods are part of reverse logistics.
Q22: Forecasting techniques generally assume an existing causal
Q31: Organizational strategy should be determined without considering
Q34: There are four resources and four jobs
Q49: Splitting a large lot after one operation
Q60: The dean of a school of business
Q68: A concert promoter is forecasting this year's
Q91: LP problems must have a single goal
Q93: For the data given below, what would
Q166: Which of the following is not a