Examlex
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R) and sassafras soda (S) . Two resources are constrained: production time (T) , of which she has at most 12 hours per day; and carbonated water (W) , of which she can get at most 1,500 gallons per day. A case of root beer requires 2 minutes of time and 5 gallons of water to produce, while a case of sassafras soda requires 3 minutes of time and 5 gallons of water. Profits for the root beer are $6.00 per case, and profits for the sassafras soda are $4.00 per case. For the production combination of 180 root beer and 0 sassafras soda, which resource is slack (not fully used) ?
System Testing
The phase in software testing where a complete, integrated system is tested to verify that it meets the specified requirements.
AON (Activity On Node)
A project management technique where each activity is represented by a node, and arrows represent dependencies, used in critical path and project scheduling analyses.
AOA (Activity On Arrow)
A network diagram convention used in project management to represent activities on arrows and milestones on nodes.
Dummy Activities
Dummy activities are artificial tasks used in project scheduling (e.g., in a PERT or CPM diagram) to establish proper relationships among actual tasks, indicating dependencies without consuming resources or time.
Q17: The service function of purchasing interfaces with
Q22: Forecasting techniques generally assume an existing causal
Q34: There are four resources and four jobs
Q40: The design of a service system often
Q68: A productivity increase in one operation that
Q77: Which of the following is not an
Q90: The president of State University wants to
Q112: A sequence of activities that leads from
Q113: In project network analysis, "slack" refers to
Q120: The business analyst for Video Sales, Inc.