There Are Four Resources and Four Jobs to Be Done

question 30

Multiple Choice

There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   What is the optimal assignment of resources to jobs? A) 1 to A; 2 to C; 3 to B; 4 to D B) 1 to B; 2 to D; 3 to C; 4 to A C) 1 to C; 2 to B; 3 to A; 4 to D D) 1 to D; 2 to B; 3 to C; 4 to A E) 1 to A; 2 to C; 3 to D; 4 to B
What is the optimal assignment of resources to jobs?


Definitions:

Range Slipout

A condition where a transmission unexpectedly slips out of a selected drive range into neutral or another range, often due to mechanical failure.

Leaking Air Hose

A condition where an air hose has developed breaches, resulting in the unintended escape of air, potentially affecting the performance of pneumatic systems.

COE Truck Chassis

A type of truck design where the cab is situated over the engine, offering better visibility and maneuverability.

Related Questions