What technique is used to control the scope in an Agile project?
Discrepancy Reduction
The process of identifying and closing gaps between current states and desired states or goals.
Discrepancy Production
The generation of a difference or inconsistency between actual performances or outcomes and the expected or desired ones.
Discrepancy Induction
A method used to motivate change by highlighting the difference between current outcomes and desired goals.
Discrepancy Function
The difference between existing and desired conditions, used to identify gaps in performance or outcomes that need addressing.
Q9: One main principle of structured design is
Q18: Data access layer classes should _.<br>A)process all
Q19: One benefit of the event decomposition technique
Q22: List and briefly describe the five parts
Q36: A(n)_ control is a control that rejects
Q53: What is the term that defines the
Q54: In an activity diagram,a separate use case
Q65: As part of the interview process,any unresolved
Q67: UP disciplines are involved in each iteration,which
Q70: What is the term to denote a