Examlex
Suppose a JPanel with a BorderLayout manager contains two components: component1, which was added to the CENTER, and component2, which was added to the SOUTH.Which parts of the JPanel will appear?
i.North
II.South
III.Center
IV.West
v.East
Activity Variances
Differences between planned activities (budgeted) and actual activities in management accounting, used for monitoring performance and guiding decisions.
Flexible Budget
A budget that adjusts or flexes with changes in the volume or activity level, allowing for better budgetary control under different operational circumstances.
Actual Activity
The real measure of activity achieved in a given period, such as units produced, machine hours, or labor hours.
Flexible Budget
A budget that adapts or changes according to fluctuations in activity levels or volume.
Q5: To close a connection, which of the
Q7: Suppose run1 and run2 are objects of
Q19: Which of the following satisfies the wildcard
Q24: Which of the following is NOT a
Q40: Calling the wait method in synchronized code
Q48: To get a DocumentBuilder object, first call
Q59: Based on the table below, insert the
Q61: Consider the following tree diagram: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB7392/.jpg"
Q72: Consider the following tree diagram: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB7392/.jpg"
Q76: A hash function is considered good if