The concept that represents the sum of all costs associated with making and delivering products to the point where they are needed is called:


Definitions:

Task Times

The duration required to complete specific jobs or assignments in a production or work process.

Assembly Line

A production process that breaks down the manufacture of a product into steps that are completed in a pre-defined sequence, often on a conveyor belt, to increase efficiency.

Required Times

The specific durations needed to complete tasks or activities within a process, project, or operating schedule.

Cycle Time

The total time from the beginning to the end of a process, indicating the speed at which a complete cycle can be executed.