Examlex

Solved

A Potential Difficulty with Pay-For-Performance Programs Is How to Measure

question 51

True/False

A potential difficulty with pay-for-performance programs is how to measure employee performance.


Definitions:

Set Point

The desired or target value for a process variable in a control system.

Error Signal

A feedback signal indicating the difference between a desired setpoint and the actual output, used to correct system performance.

Proportional Gain

Proportional Gain is a parameter in PID control that determines the relationship between the magnitude of the error signal and the magnitude of the control variable.

Related Questions