Examlex
A clock lost 4 minutes and 40 seconds in 40 days. How many seconds did it lose per day?
Main Routine
The primary sequence of instructions or program that runs in a PLC or computer to execute various tasks.
Consumed Tag
In industrial automation, a tag or variable from one device that is used or read by another device across a network.
Produced Tag
A label or identifier in a control system that represents data or a status generated by one device and made available to others.
Structure-Type Tag
In PLC programming, it refers to user-defined data types that allow the grouping of multiple related variables under a single name.
Q19: Which of the following stimulates the production
Q29: A coffee shop is open 3 hours
Q48: What kind of bond would hold carbon
Q50: Which of the following is not an intermolecular force?<br>A)Dispersion force<br>B)Metallic bond<br>C)Dipole-dipole interaction<br>D)Hydrogen bond
Q85: In 32 days, a person saved $72.
Q90: In an experiment, a reaction requires 0.006
Q145: Soil sells for 8 <sup>1</sup>/<sub>4</sub> cents per
Q167: Which of the following is the correct term for chemicals on the left side of the reaction arrow? <br>A)Equation<br>B)Products<br>C)Reactants<br>D)Ions
Q179: Which of the following statements is true?<br>A)Shells
Q353: Which of the following scenarios would result