Examlex

Solved

A Chart Showing the Trend in the Lag Time from Defect

question 16

Multiple Choice

A chart showing the trend in the lag time from defect reporting to resolution during system testing is also available. The chart shows that the daily closure period is consistently and significantly above the rolling closure period for a long period of the system testing phase. Almost all defects found during system testing have been related to the system as a whole, not related to single units or integrations issues. Almost all quality risks have been addressed during the unit and integration testing phase and no residual quality risks were present in the integrated system. This has been confirmed by exploratory testing sessions performed during system testing, targeted at finding defects in these quality risk areas. Based on the given information only, which one of the following areas would you expect to be considered more in the retrospective meeting in order to be improved?


Definitions:

Unity

Unity refers to the state or quality of being united or joined as a whole.

Paragraph

A distinct section of a piece of writing, typically dealing with a single theme and indicated by a new line, indentation, or numbering.

Mixed Construction

A grammatical mistake where parts of a sentence are mismatched, often leading to confusion and lack of clarity in the expression of ideas.

Unrelated Ideas

Concepts or thoughts that do not have a direct link or connection to each other.

Related Questions