Examlex

Solved

Refer to the Exhibit

question 546

Multiple Choice

  Refer to the exhibit. As the new network designer for a manufacturing company, you are designing this resilient Ethernet ring for the plant Ethernet network that is connected to the core, which does not use STP. Both edge ports are on the same switch in a ring segment. There is connectivity between the edge ports throughout the segment, so you create a redundant connection between any two switches in the ring. Which four options are characteristics of this design? (Choose four.)  A)  If a link fails, then the alternate ports quickly unblock. When the failed ink comes back up, a physically blocked port per VLAN is selected with minimal disruption to the network. B)  If a link fails, then the alternate portsquickly unblock. Whenthe failed ink comes back up, a logically blocked port per VLAN is selected with minimal disruption to the network. C)  If VLAN load balancing is configured, then two ports in the segment control the blocked state of VLANs. D)  If VLAN load balancing is configured, then one port in the segment controls the blocked state of VLANs. E)  If all ports in the segment are operational, then one port is in the blocked state for each VLAN. F)  If one or more ports in a segment are not operational, thereby causing a linkfailure, then all ports forward traffic on all VLANs to ensure connectivity. G)  If all ports in the segment are operational, then two ports are in the blocked state for each VLAN. Refer to the exhibit. As the new network designer for a manufacturing company, you are designing this resilient Ethernet ring for the plant Ethernet network that is connected to the core, which does not use STP. Both edge ports are on the same switch in a ring segment. There is connectivity between the edge ports throughout the segment, so you create a redundant connection between any two switches in the ring. Which four options are characteristics of this design? (Choose four.)


Definitions:

On-time Rates

A metric often used in logistics and service industries to measure the percentage of tasks or deliveries completed within the expected time frame.

Scheduled Deliveries

The planned timing and routing of deliveries to ensure efficient and timely arrival of goods.

On-time Rates

A measure of the frequency or probability that an event or task is completed within the designated time frame.

Scheduled Deliveries

Deliveries that are planned and organized to occur at specific times or intervals.

Related Questions