Examlex

Solved

You Are Architecting an HPC Solution in AWS

question 255

Multiple Choice

You are architecting an HPC solution in AWS. The system consists of a cluster of EC2 instances that require low-latency communications between them. Which method should you use to set up a cluster to meet these requirements?


Definitions:

Variable Overhead Spending Variance

The difference between the actual variable overheads incurred and the expected costs based on standard overhead rates.

Standard Quantity

The expected or predetermined amount of materials or input required to produce a single unit of product.

Standard Price

A predetermined cost assigned to materials, labor, and overhead, used as a benchmark against which the actual costs are compared.

Related Questions